SkyTran Structural
Posts
Foundation preparation,
installation, attachment and alignment procedures
Using basic
semi-automation construction
techniques, we have determined that it will take less than
$2,000 per pole installation - including all material components
and labor. |
|
Step 1:
Hydraulic auger drills post hole. |
|
Step 2:
Rebar preform with structural extension studs is placed in hole. |
|
Step 3:
Concrete is added. |
|
Step 4: Prefab pole lifted in
place, then aligned to vertical and secured to four studs with
adjustment nuts. (Single crane operator
has remote control of boom extension, boom lift angle and boom
swivel with small joystick attached to his belt.) |
|
Step 5: Cross brace for roll formed
track installed and laser aligned |